We don't just move freight — we solve the problems other brokers walk away from. Here's proof.
The Mammoet PTC Crane Relocation
Relocating the world's 3rd largest crane from the Alberta oil sands to a US Steel plant in Indiana — on a 3–5 day bid window, in −30°C weather, in the middle of a global fuel crisis.
A Perfect Storm of Complexity
When Mammoet needed to relocate the world's 3rd largest crane from Northern Alberta to US Steel in Indiana, they faced a logistical nightmare. US Steel was relying on this crane to build Furnace #14 — any delay would have cascading financial impacts.
Extreme Time Constraints
Enzo Logistics was given just 3–5 days' notice to place a bid and mobilize full capacity for a 350-load operation.
Harsh Winter Conditions
The project commenced in the dead of winter in Fort McMurray, where temperatures regularly drop below −30°C, making loading and securing treacherous.
Massive Scale & Variety
350 total truckloads over 40 days, averaging 15–20 trucks per day — cargo ranging from standard legal dimensions to extreme heavy haul.
Unprecedented Market Disruption
Midway through the project, a global conflict erupted, causing an immediate spike in fuel prices and a severe shortage of market capacity.
Proactive Operations & Unwavering Commitment
Onsite Leadership & Presence
Sep Shahrokhi, CEO of Enzo Logistics, was personally onsite for the critical first two weeks to ensure a smooth launch and establish the operational rhythm. Carlos, our dedicated onsite supervisor, remained in Fort McMurray for the duration of the project and was flown to Gary, Indiana to supervise delivery of the final shipments — ensuring every truck was loaded correctly, secured safely, and dispatched on time.
Total Transparency & Live Tracking
We implemented a live, shared tracking sheet with the client, giving Mammoet and US Steel real-time data on every single driver, truck, and load — complete, transparent access 24/7.
Strategic Capacity Allocation
Despite a sudden shortage of market capacity and skyrocketing fuel costs, we honored our commitments — leveraging deep relationships with specialized heavy haul carrier partners and absorbing market volatility to keep our client's supply chain uninterrupted.
Collaborative Planning
We held regular meetings with the client to discuss loading sequences, route optimization, and contingency plans — understanding the project as intimately as the engineers building the furnace.
Delivered On Time, Against All Odds
Despite a 40-day timeline, 350 complex loads, extreme winter weather, a global fuel crisis, and capacity shortages, Enzo Logistics delivered. The PTC crane components arrived safely at US Steel in Gary, Indiana, allowing construction of Furnace #14 to proceed without delay.
We Honor Our Terms
When the market disrupted, we didn't renegotiate. We delivered.
We Are Operators
Onsite presence and live tracking proved our commitment to execution.
We Solve Problems
Around-the-clock work to overcome communication and logistical hurdles.
"No one could have done it better."
Enzo Logistics: Your Complete Logistics Partner.